The Cube (Front of House)

The Cube (Front of House)

Due to the programme of works carried out at The Cube, we have broken down the project into front and back of house. This page is dedicated to front of house. Read about The Cube (Back of House).

Client: BuildAbility
Project: The Cube | Development of new apartments, offices, shops and restaurants
Location: The Cube (The Mailbox final phase), Birmingham City centre
Duration: 36 months
Completed: Early 2011
Details: We have been involved in the design, fabrication, supply and installation of various works within and around The Cube as detailed below:

  • Steel staircases
  • Stainless steel balustrade
  • Stainless steel handrail
  • Link bridge (between The Cube and The Mailbox)
  • Atrium glass – heat soaked toughened laminated glass, screen printed with squares at the base
  • Support steelwork
  • Door, gates, railings
  • Stainless steel artwork on Level 5, with resin bound paving and glass for views through to lower level car park
  • Installation of artwork in various locations, including hanging man in the middle of the building supported with stainless steel wire rope (Twitter : TheLovelyPeople)